Detailed Design, procurement, manufacture, both FAT and SAT, inspections, site installation works and commissioning of the ventilation systems serving the MCI WTA project for NRS Dungeness A.
Provision of Engineering Management.
The Active Ventilation System consisting of a Modular Containerised Plantroom, (MCP), primary containment HEPA Filtration, inter-connecting ducting system, remove containerised ventilation plantroom, stack with stack sampling system, trace heated.
Oct 23 – Current.