Stage 1 Configuration

This is the “Enclosure Selection” allowing the User to pre-select standardised enclosure dimensions and arrangements to suit the Specialist Fitout in Stages 2, 3 & 4.

Follow the inputs to the end and press “Continue” this will take you to “STAGE 2 CONFIGURATION” which is the start or the “Primary System Requirements – Specialist Fitout”

 

Specialist Fitout

Stage 2 Configuration

This is the “Primary System Requirements” selection of; HEPA Filtration, Fans, DOP Testing, Material Selection.

Follow the inputs to the end and press “Continue” this will take you to “STAGE 3 CONFIGURATION” which is the start or the “Secondary System Requirements – Specialist Fitout”

Specialist Fitout Drawing
Specialist Fitout

Stage 3 Configuration

This is the “Secondary System Requirements” selection of; Carbon Filtration, Spark Arrestors, ATEX Requirements, Auto Shut-off Dampers, Fire Dampers.

Follow the inputs to the end and press “Continue” this will take you to “STAGE 4 CONFIGURATION” which is the start or the “Electrical, Control & Instrumentation Requirements”

Specialist Fitout

Stage 4 Configuration

This is the “EC&I Requirements” selection of system control and panel, I/O, Field Instrumentation, Power, Control functions, alarms and interlocks.

Follow the inputs to the end and press “Continue” this will then fully configure the system based on the User Input Requirements from Stages 1 to 4.

The new configured system forms the basis of the User Requirements Specification (URS) for manufacture and procurement.

The User will be able to download all selected input data.

Specialist Fitout

Project Enquiries - Get in Touch - Speak to an Engineer